top of page

Cadastral Connection and Positioning of Mile Posts 

​

Mitchell Tobin

​

The project included to establish a cadastral connection, and to locate, verify and obtain the positioning of mile posts along the Rabbit Proof Fence. The cadastral connection was conducted by verifying intersection points at each road survey corner and a resurvey of those points using observations taking to the trigonometric mark HK96. Afterwards, mile posts along the Rabbit Proof Fence were located using field books and deposited plans. The mile posts were validated, and their positioning obtained using GNSS receivers. 

Rabbit Proof Fence

DSC_4879.JPG
bottom of page